翻訳と辞書
Words near each other
・ West Siberian petroleum basin
・ West Siberian Plain
・ West Siberian Railway
・ West Side
・ West Side (album)
・ West Side (Manhattan)
・ West Side Access
・ West Side and Mendocino Railroad
・ West Side Area Vocational Technical School
・ West Side Avenue (HBLR station)
・ West Side Belt Railroad
・ West Side Boys
・ West Side Church
・ West Side Community Garden
・ West Side Community Health Services
West Side CSO Tunnel
・ West Side Dom Polski
・ West Side Elevated Highway
・ West Side High School (Dayton, Idaho)
・ West Side High School (Greers Ferry, Arkansas)
・ West Side High School (New Jersey)
・ West Side Highway
・ West Side Highway (disambiguation)
・ West Side Highway, Washington
・ West Side Historic District
・ West Side Historic District (Aurora, Illinois)
・ West Side Historic District (Carson City, Nevada)
・ West Side Historic District (Hendersonville, North Carolina)
・ West Side Historic District (Saratoga Springs, New York)
・ West Side Jewish Center


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

West Side CSO Tunnel : ウィキペディア英語版
West Side CSO Tunnel


The West Side Combined Sewer Overflow Tunnel (also West Side Big Pipe) is a tunnel in Portland, Oregon, United States. It receives and stores overflow from the combined sewer system before it can reach the Willamette River. The main tunnel is in diameter and long for a capacity of and connects to dozens of smaller sewer overflow interceptors along the west side of the Willamette River.
The tunnel receives flows that might otherwise reach the river. Instead, the CSO tunnel transports them to the Swan Island Pump Station. Portland's 1930s sewer design combined street and surface runoff with sewage in a common system that was overwhelmed during heavy precipitation. The original system handled overflows by sending excess flow into the river.〔 〕
The tunnel is below ground level. It passes under the Willamette River between the NW Nicolai Street shaft () to the confluent vertical shaft on Swan Island (), which also receives the East Side Big Pipe. From Nicolai, it travels roughly south close to Front Avenue. There are vertical shafts at Upshur (), Ankeny (), and Clay streets ().〔 (【引用サイトリンク】 Combined Sewer Overflow Projects (The Big Pipe) ) 〕 The Clay Street shaft receives the Southwest Parallel Interceptor, a pipeline which runs along the west Willamette shore for to Virginia Avenue and Taylors Ferry Road .〔
The project is a part of the Willamette River combined sewer overflow expansion program. Construction occurred from November 2002 to September 2006, and the project became fully operational in December 2006.〔 (【引用サイトリンク】 West Side CSO Tunnel Project ) 〕〔 (【引用サイトリンク】 West Side Big Pipe Project )
A 20-year series of related CSO projects, including the West Side Big Pipe, culminated in late 2011 with completion of the East Side Big Pipe. The combined projects reduced the city's sewer overflows into the Willamette River by 94 percent and into the Columbia Slough by more than 99 percent.〔(【引用サイトリンク】publisher=Portland Bureau of Environmental Services )〕 The total cost of the projects, about $1.4 billion, is being financed over time through additions to the Portland sewer rates. Almost no financial support for the projects came from state or Federal governments.
== See also ==


抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「West Side CSO Tunnel」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.